Final Modification to National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges From Construction Activities (Final)
Jun. 4, 2019
EPA Regions issued a final modification to the 2017 NPDES general permit for stormwater discharges from construction activities, also referred to as the ``2017 Construction General Permit (CGP)' or ``2017 CGP,' which became effective on February 16, 2017. The modified permit, hereinafter known as the ``modified 2017 CGP' or ``final modified permit,' replaces several conditions in the original 2017 CGP and relevant fact sheet sections. For further information on the permit, contact the appropriate EPA Regional office. (Federal Register: 28 May 2019 [Notices] Pages 24503-24506).
 