FedCenter.gov
Program Areas
Quick Reference
 
 
 
Members
  
Reconsideration of the Dust-Lead Hazard Standards and Dust-Lead Post-Abatement Clearance Levels; Correction (Final)
Jul. 10, 2025
EPA is correcting a final rule that appeared in the Federal Register of 12 November 2024, that finalized several revisions to EPA's lead-based paint (LBP) regulations. Subsequent to publication, the Office of the Federal Register (OFR) informed the Agency that there were errors in the amendatory instructions that describe specific revisions for two sections of the regulation. In the Federal Register of 16 December 2024, EPA published a technical correction to the final rule that explained the errors and the corresponding technical corrections that the Agency believed would address the errors identified by the OFR. Unfortunately, that technical correction did not fix the amendatory instructions prior to the effective date of the final rule. As a result, when the final rule became effective on 13 January 2025, three subparagraphs of regulatory text were inadvertently deleted--a change to the post-abatement regulatory activities that EPA did not intend to make. This action corrects that error by restoring the inadvertently deleted text in the regulations. Effective 9 July 2025. POC is Claire Brisse; tele: (202) 564-9004; email: brisse.claire@epa.gov. (Federal Register 9 July 2025 [Rule] Pages 30211-30213)
 

Item Attachments
There are no attachments.
Related Items
There are no related items.

Terminator
 
Last Updated: January 22, 2018