Steps 25 - 28  | 
| Episodic Reporting Requirements | |||||||
| The following steps describe the on-going requirements.  The facility personnel are responsible for assuring that this section of Module 4 is performed whenever necessary so that all on-going requirements are met whenever they are relevant. | 
|||||||
|   Yes  | 
|||||||
| No | 
|||||||
Module 4, Steps 31 and 32  | 
|||||||
DOE Office of Environmental Policy and Guidance  | 
||