FedCenter.gov
Program Areas
Quick Reference
 
 
 
Members
  
National Electric Vehicle Infrastructure Formula Program (Draft)
Jun. 22, 2022
The FHWA proposes to establish regulations setting minimum standards and requirements for projects funded under the National Electric Vehicle Infrastructure (NEVI) Formula Program and projects for the construction of publicly accessible electric vehicle (EV) chargers under certain statutory authorities. The standards and requirements proposed would apply to the installation, operation, or maintenance of EV charging infrastructure; the interoperability of EV charging infrastructure; traffic control device or on-premises signage acquired, installed, or operated in concert with EV charging infrastructure; data, including the format and schedule for the submission of such data; network connectivity of EV charging infrastructure; and information on publicly available EV charging infrastructure locations, pricing, real-time availability, and accessibility through mapping applications. Comments must be received on or before 22 August 2022. POC is Mr. Gary Jensen, Office of Natural Environment, (202) 366-2048, or via email at Gary.Jensen@dot.gov. (Federal Register 22 June 2022 [Proposed Rule] Pages 37262-37280).


Item Attachments
There are no attachments.
Related Items
There are no related items.

Terminator
 
Last Updated: January 22, 2018